Client:
|
Pig Improvement
Corporation |
Vierbicher Associates, Inc. provided
engineering and surveying services for the following Pig
Improvement Corporation farms.
Corporate Farm,
Spring Green, WI
The project consisted of conducting an investigation to
determine adequacy of the existing animal waste facility
for Pig Improvement Corporation's main farm; preparing
the application for the WPDES permit; and preparing the
Animal Waste Management Plan.
Kronsader Farms, Marengo, IL
Design, construction
observation, and surveying for new animal waste holding
lagoons with a design capacity of 1,465,000 cubic feet.
This project included the construction of a new hog
operation which consisted of a 2,500 acre farm with
approximately 10,300 hogs.
Crouch Hog Farm,
Richland Co., WI
Analyzed capacity and
condition of existing animal waste lagoons and
determined existing lagoons were inadequate. Vierbicher
Associates designed new manure storage system which
consisted of primary and secondary lagoons with a
4,000,000 gallon design capacity. We also prepared a
WPDES permit application and an Animal Waste Management
Plan. We provided construction, inspection, and
surveying services. |
|