| Portage
Well No. 8 |
The
City of Portage constructed Well No. 8 to replace
an existing well that was found to be contaminated
with tetrachlorethylene. The loss of the existing
well put excess demand on the two remaining wells.
This created a water supply deficiency that
required the City to construct a new well. To make
it affordable, a CDBG grant was obtained to help
fund the $1.3 million project.
The new 2,100 GPM
capacity well includes iron filtration and water
softening equipment and is integrated into the
City’s SCADA system. A new 6,600 square foot
building was connected to an existing building
that was remodeled for use as the new Portage
Water Utility office.
|
|
|
|
Vierbicher
Associates, Inc. provided the following services
for Portage Well No. 8. |
- Community
Development
- Architecture
- Engineering
- Surveying and
Mapping
|
| Following
is a specific list of project activities. |
- CDBG Emergency
Grant Application
- Grant
Administration
- Site Surveying
- Engineering
for Well, Iron Filtration and Water Softening
- Architectural
Services for Building
- Computer Water
System Map
|
|
Learn more about Vierbicher's Water
Supply
Services |
|
|