Vierbicher

success stories

local governmentstate & tribal governmentdevelopers

Teel Plastics
Gateway Business Park


Planning & Community Development

Comprehensive Planning

Neighborhood Planning

Urban Redevelopment Planning

Outdoor Recreation Planning

Public Facilitation

Impact Fee Planning

Developer Representation

Economic Development

Business/Industrial Parks

Tax Increment Financing (TIF)

Market Analysis

Strategic Planning

Fiscal and Economic Impact Analysis

Grant Writing / Administration

Business Recruitment

Urban Design & Landscape Architecture

Concept Planning

Illustrations & Renderings

Park & Plaza Design

Landscaping Plans

Streetscape

Bike & Pedestrian Trails

Municipal & Civil Engineering

Municipal Infrastructure Design & Studies

Streets and Roadways

Site Development

Stormwater Systems

Water Supply & Distribution Systems

Wastewater Treatment & Collection Systems

Construction Observation & Administration

Surveying & GIS

CSMs, Boundary Surveys and Legal Descriptions

Platting: Subdivision/Condominium/Assessor’s/ Right of Way

Topographic Surveys/Aerial Mapping Control

Construction Staking

ALTA/ACSM Land Title Surveys

Easement Mapping and Descriptions

Parcel/Utility Mapping

Floodplain Surveys/ FEMA Elevation Certificates

Geographic Information Systems (GIS)

Water & Environmental Resources

Floodplain Analysis

Lake Rehabilitation & Management

Stormwater & Water Quality Management

Environmental Assessments

Regulatory Compliance & Permitting

Wetland Management

Agricultural Engineering

Animal Waste Management Facilities

Regulatory Permits

Water Runoff and Drainage Facilities

Construction Observation and Administration

Building Inspection

Uniform Dwelling Code Enforcement

Commercial Building Code Enforcement

Property Maintenance Inspection

 

Teel Plastics  Gateway Industrial Park

Teel Plastics  Gateway Industrial Park
Teel Plastics  Gateway Industrial Park
Teel Plastics  Gateway Industrial Park

This 80-acre development is located south of Highway W in Baraboo, Wisconsin. Gateway Business Park is designed to be a mixed-use commercial and light manufacturing development. This park is the home of the new Teel Plastics facility, a 130,000 square foot “showcase”.

During the concept planning phase of this project. Vierbicher conducted a market analysis of the area and recommended purchase of an adjoining 40-acre parcel to fully realize the development potential of this project. A concept alternative was prepared by Vierbicher to maximize the visibility of the development on the new Baraboo bypass and the future USH 12 Interchange.

Vierbicher also assisted the developer with identifying and securing funding options, including: TIF assistance, TEA grant funding through the Wisconsin Department of Transportation, and CDBG grant funding.

Vierbicher provided concept planning, market analysis, site surveying, site design, public infrastructure design, and construction phase services for this project. Vierbicher also assisted the developer by attending meetings to secure approvals with the City of Baraboo as well as in helping to select a builder for the facility.